Longview output is up. See what’s changed.

| Nov 2026

Six months ago, our Longview plant built 40 units a week, marking the low point of our production. Last month, our team built 200 units in a single week, returning to pre-disruption production levels!

That jump came from rebuilding operations from the ground up. In the video linked below, Rodrigo Guerrero, Director of Manufacturing in Longview, walks through a few of the changes driving these results:

  • Kitting. Builders used to pull parts off the racks one at a time. Now every part needed arrives preset on a single cart, so the line keeps moving.

  • Wiring. A 5S approach and daily Gemba walks keep the team focused on what's needed today and tomorrow. ("Gemba" is Japanese for "the real place." On Gemba walks, leaders go to the floor to see the work firsthand.) Automated wire processing lets us prep ahead instead of cutting from bulk rolls on demand.

  • Plant Control Center. Every morning, team leads gather at the PCC boards to review safety, quality, delivery, cost, and maintenance. One standard system keeps the whole plant aligned on speed and delivery.

 



The result is stability. Throughput has climbed, the process holds steady, and lead times continue to fall.

Longview is ready for your business, and we want to earn our way back into your basis of design. The best way to see the difference is in person. Come walk the floor, meet the team, and see it for yourself. Contact your Technical Sales Manager to arrange your Longview visit.

We have more Longview stories coming your way soon. Thank you, as always, for your continued support.